East Tennessee Natural Gas, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/20/2008, Docket: RP08-277-000, Status: Effective
Fourth Revised Sheet No. 335 Fourth Revised Sheet No. 335 : Effective
Superseding: Third Revised Sheet No. 335
GENERAL TERMS AND CONDITIONS (Continued)
(v) Among interruptible services, according to the IT or IT-L
rate, as applicable, paid by Shippers each Month, with IT or
IT-L Shippers, as applicable, at higher rates being
scheduled ahead of IT or IT-L Shippers, as applicable, at
lower rates. The foregoing notwithstanding, if an IT or IT-
L Shipper was flowing gas under its IT or IT-L Agreement, as
applicable, during the previous Month, such Shipper will be
notified if its current IT or IT-L nomination can not be
scheduled due to price, and given an opportunity to offer a
price that will enable its IT or IT-L nomination to be
scheduled. IT or IT-L Shippers paying the same rate shall
be scheduled pro rata based on Scheduled Quantities. For
the purpose of this Subsection (v), any Shipper paying a
rate above the maximum rate, shall be deemed to be paying
the maximum applicable rate.
(vi) Among PAL Shippers based on net present value, with the
transaction yielding the highest net present value receiving
priority over transactions yielding a lower net present
value. Net present value shall be calculated on the basis
of the present value of the daily PAL charge per Dth to
Transporter. PAL transactions yielding the same net present
value shall be scheduled pro rata based on Scheduled
Quantities. In making the determination of net present
value, Transporter shall apply the rate, as of the date of
the review, stated in accordance with the most recent 5-year
United States Government Treasury Note, to all bids.
For the purposes of determining whether points are located within
the Contract Path, Transporter shall consider a movement of gas
from a Receipt Point to a Delivery Point which is counter to the
gas flow contemplated by the Primary Receipt Point(s) and Primary
Delivery Point(s) specified in the service agreement as being
outside of the Shipper's Contract Path. In addition, for any
movement of gas that traverses a segment(s) in which the total
nominated quantity for that contract exceeds the firm contractual
entitlement, the nominated quantity in excess of the firm
contractual entitlement shall be deemed to be outside of the
Shipper's Contract Path for that portion of the nominated
quantity that exceeds the firm contractual commitment.
(b) Throughput Scheduling Priority: Transporter shall schedule gas
transported on Transporter's system in the following sequence
and/or in accordance with the supply/market rankings provided in a
Shipper's nomination:
(i) First among FT-A, FT-L, and FT-GS Shippers for gas received
within a Shipper's MDRO at a Primary Receipt Point, for gas
delivered within a Shipper's MDDO to a Primary Delivery Point, and
within a Shipper's Segment Path Rights according to the quantities
of gas nominated by such Shippers;
(ii) Pro-rata among FT-A, FT-L, and FT-GS Shippers for gas
(1) received from a Secondary Receipt Point or delivered to
a Secondary Delivery Point, as applicable, within a
Shipper's Segment Path Rights, or
(2) received from a Primary Receipt Point or delivered to a
Primary Delivery Point, as applicable, which is in
excess of a Shipper's MDRO or MDDO, as applicable, but
within a Shipper's Segment Path Rights,
according to the quantities of gas nominated by such
Shippers;