East Tennessee Natural Gas, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/20/2008, Docket: RP08-277-000, Status: Effective
Third Revised Sheet No. 124 Third Revised Sheet No. 124 : Effective
Superseding: Second Revised Sheet No. 124
RATE SCHEDULE FT-GS
FIRM TRANSPORTATION SERVICE
3.4 Secondary Receipt and Delivery Points: FT-GS Shippers may not use Secondary
Delivery Points. Shipper may use as a Secondary Receipt Point any other receipt
point located on that portion of Transporter's system not designated as an
Incremental Lateral by notifying Transporter in Shipper's nomination entered via
LINK®. A Shipper may also use a Primary Receipt Point located on that portion of
Transporter's system not designated as an Incremental Lateral as a Secondary Point
to the extent that Shipper nominates quantities at the Primary Point in excess of
the Shipper's Maximum Daily Receipt Obligation or Maximum Daily Delivery Obligation,
as applicable, at that Primary Point, but less than or equal to the Maximum Daily
Transportation Quantity under the FT-GS Agreement. A firm Shipper's rights to use a
Secondary Receipt Point shall be superior to all interruptible Shippers' use of that
point, but inferior to the rights of all firm Shippers using that point as a Primary
Receipt Point. In addition, a firm Shipper's rights to use a Secondary Receipt
Point within its Contract Path will be superior to the rights of all Shippers using
that point outside their Contract Paths. A Shipper's total receipts on any day
shall not exceed the Maximum Daily Transportation Quantity stated in its FT-GS
contract. If the capacity at a Secondary Receipt Point is insufficient to serve all
Shippers requesting the point, the receipt quantities for that point shall be
allocated in accordance with Section 15 of the General Terms and Conditions.
Nominations utilizing secondary receipt points located upstream of Dixon Springs
(Compressor Station 3104) on the 3100 Line by a firm Shipper with Primary Receipt
Point(s) located upstream of Dixon Springs will be treated, for scheduling and
curtailment purposes, as nominations from secondary points within Contract Path on
the 3100 Line up to the Maximum Daily Receipt Obligation stated in the FT-GS
agreement at the Shipper's primary point(s) of receipt located upstream of Dixon
Springs.
Nominations utilizing secondary receipt points located upstream of Lewisburg
(Compressor Station 3206) on the 3200 Line by a firm Shipper with Primary Receipt
Point(s) located upstream of Lewisburg will be treated, for scheduling and
curtailment purposes, as nominations from secondary points within Contract Path on
the 3200 Line up to the Maximum Daily Receipt Obligation stated in the FT-GS
agreement at the Shipper's primary point(s) of receipt located upstream of
Lewisburg.
3.5 Accounting Points: In certain situations, Transporter may use an accounting meter
number to represent a physical location on its pipeline system. A Primary Receipt
Point or a Primary Delivery Point identified on Shipper's executed service
agreement(s) may be designated in the LINK® System by means of an accounting meter
number and description that differs from the physical meter number and description
specified on the service agreement. The same rights and obligations exist for both
Transporter and Shipper regardless of whether a location is identified in Shipper's
executed service agreement by means of a physical meter number or an accounting
meter number.