East Tennessee Natural Gas, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/02/2010, Docket: RP10-946-000, Status: Effective

Fifth Revised Sheet No. 102 Fifth Revised Sheet No. 102

Superseding: Fourth Revised Sheet No. 102

 

FT-A RATE SCHEDULE

FIRM TRANSPORTATION SERVICE

 

 

2.4 If so specified in Exhibit A to Shipper's FT-A agreement, a five-Month Winter Season

service under Rate Schedule FT-A shall be available on the Nora supply lateral, with firm

transportation service commencing each November 1 and concluding on March 31 of the

following year for the term of the agreement. Under such an FT-A agreement, Shipper will

pay demand charges only during the Months of the Winter Season. Unless otherwise provided

in the General Terms and Conditions of Transporter's FERC Gas Tariff, rates for such

service shall be as stated on the Notice of Rates and Other Tariff Rate Changes.

 

3. DELIVERIES AND RECEIPTS

 

3.1 Receipt Points: The Primary Receipt Point(s) for all gas transported by Transporter

under this Rate Schedule on that portion of Transporter's system not designated as an

Incremental Lateral shall be at the mutually agreeable interconnection(s) between

Transporter's system and the connecting facilities of Shipper or Shipper's designee

shown on Exhibit A to the FT-A Agreement. Transporter shall not be required under any

circumstances to receive gas at any Receipt Point where (1) the total quantity of gas

scheduled for receipt on any Day is less than that required for the accurate

measurement of quantities to be received or (2) the total quantity of gas scheduled for

receipt at that point is less than that required to operate existing compression

facilities necessary to receive gas at such point. The sum of the MDROs specified at

all of Shipper's Primary Receipt Point(s) must equal the Maximum Daily Transportation

Quantity stated in the FT-A Agreement.

 

East End Storage: Nominations utilizing receipt points for storage withdrawals from

(1) the Kingsport LNG facility (M&R 57000 located in Sullivan County, TN); (2) the

Early Grove storage facility (M&R 59009 located in Washington County, VA); (3) the

original Saltville storage facility (M&R 59777 located in Smyth County, VA); (4) the

original Saltville (Radford) storage facility (M&R 59195 located in Pulaski County,

VA); and (5) the Saltville, LLC storage facility (M&R 59770 located in Smyth County,

VA) will be treated on an aggregate basis, for scheduling and curtailment purposes, as

nominations from Primary Receipt Point(s) up to the sum of the Maximum Daily Receipt

Obligation(s) stated in the FT-A Agreement for those points of receipt.

 

3.2 Delivery Points: The Primary Delivery Point(s) for all gas transported by Transporter

under this Rate Schedule on that portion of Transporter's system not designated as an

Incremental Lateral shall be at the mutually agreeable interconnection(s) between

Transporter's system and the facilities of Shipper or Shipper's designee shown on

Exhibit A to the FT-A Agreement. Transporter shall not be required under any

circumstances to deliver gas at any Delivery Point where (1) the total quantity of gas

scheduled for delivery on any Day is less than that required for the accurate

measurement of quantities to be delivered or (2) the total quantity of gas scheduled

for delivery at such point is less than that required to operate existing compression

facilities necessary to deliver gas to such point. The sum of the MDDOs specified at

all of Shipper's Primary Delivery Point(s) must equal the Maximum Daily Transportation

Quantity stated in the FT-A Agreement.

 

East End Storage: Nominations utilizing delivery points for storage injections into

(1) the Kingsport LNG facility (M&R 56000 located in Sullivan County, TN); (2) the

Early Grove storage facility (M&R 59147 located in Washington County, VA); (3) the

original Saltville storage facility (M&R 59766 located in Smyth County, VA); (4) the

original Saltville (Radford) storage facility (M&R 59194 located in Pulaski County,

VA); and (5) the Saltville, LLC storage facility (M&R 59760 located in Smyth County,

VA) will be treated on an aggregate basis, for scheduling and curtailment purposes, as

nominations to Primary Delivery Point(s) up to the sum of the Maximum Daily Delivery

Obligation(s) stated in the FT-A Agreement for those points of delivery.

 

3.3 Changing Primary Receipt and Delivery Points: Subject to availability of firm

capacity, Shipper may change the Primary Receipt or Delivery Points under its FT-A

Agreement pursuant to Sections 5.7 and 5.8 of the General Terms and Conditions of this

FERC Gas Tariff.