East Tennessee Natural Gas, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/02/2010, Docket: RP10-946-000, Status: Effective
Fifth Revised Sheet No. 102 Fifth Revised Sheet No. 102
Superseding: Fourth Revised Sheet No. 102
FT-A RATE SCHEDULE
FIRM TRANSPORTATION SERVICE
2.4 If so specified in Exhibit A to Shipper's FT-A agreement, a five-Month Winter Season
service under Rate Schedule FT-A shall be available on the Nora supply lateral, with firm
transportation service commencing each November 1 and concluding on March 31 of the
following year for the term of the agreement. Under such an FT-A agreement, Shipper will
pay demand charges only during the Months of the Winter Season. Unless otherwise provided
in the General Terms and Conditions of Transporter's FERC Gas Tariff, rates for such
service shall be as stated on the Notice of Rates and Other Tariff Rate Changes.
3. DELIVERIES AND RECEIPTS
3.1 Receipt Points: The Primary Receipt Point(s) for all gas transported by Transporter
under this Rate Schedule on that portion of Transporter's system not designated as an
Incremental Lateral shall be at the mutually agreeable interconnection(s) between
Transporter's system and the connecting facilities of Shipper or Shipper's designee
shown on Exhibit A to the FT-A Agreement. Transporter shall not be required under any
circumstances to receive gas at any Receipt Point where (1) the total quantity of gas
scheduled for receipt on any Day is less than that required for the accurate
measurement of quantities to be received or (2) the total quantity of gas scheduled for
receipt at that point is less than that required to operate existing compression
facilities necessary to receive gas at such point. The sum of the MDROs specified at
all of Shipper's Primary Receipt Point(s) must equal the Maximum Daily Transportation
Quantity stated in the FT-A Agreement.
East End Storage: Nominations utilizing receipt points for storage withdrawals from
(1) the Kingsport LNG facility (M&R 57000 located in Sullivan County, TN); (2) the
Early Grove storage facility (M&R 59009 located in Washington County, VA); (3) the
original Saltville storage facility (M&R 59777 located in Smyth County, VA); (4) the
original Saltville (Radford) storage facility (M&R 59195 located in Pulaski County,
VA); and (5) the Saltville, LLC storage facility (M&R 59770 located in Smyth County,
VA) will be treated on an aggregate basis, for scheduling and curtailment purposes, as
nominations from Primary Receipt Point(s) up to the sum of the Maximum Daily Receipt
Obligation(s) stated in the FT-A Agreement for those points of receipt.
3.2 Delivery Points: The Primary Delivery Point(s) for all gas transported by Transporter
under this Rate Schedule on that portion of Transporter's system not designated as an
Incremental Lateral shall be at the mutually agreeable interconnection(s) between
Transporter's system and the facilities of Shipper or Shipper's designee shown on
Exhibit A to the FT-A Agreement. Transporter shall not be required under any
circumstances to deliver gas at any Delivery Point where (1) the total quantity of gas
scheduled for delivery on any Day is less than that required for the accurate
measurement of quantities to be delivered or (2) the total quantity of gas scheduled
for delivery at such point is less than that required to operate existing compression
facilities necessary to deliver gas to such point. The sum of the MDDOs specified at
all of Shipper's Primary Delivery Point(s) must equal the Maximum Daily Transportation
Quantity stated in the FT-A Agreement.
East End Storage: Nominations utilizing delivery points for storage injections into
(1) the Kingsport LNG facility (M&R 56000 located in Sullivan County, TN); (2) the
Early Grove storage facility (M&R 59147 located in Washington County, VA); (3) the
original Saltville storage facility (M&R 59766 located in Smyth County, VA); (4) the
original Saltville (Radford) storage facility (M&R 59194 located in Pulaski County,
VA); and (5) the Saltville, LLC storage facility (M&R 59760 located in Smyth County,
VA) will be treated on an aggregate basis, for scheduling and curtailment purposes, as
nominations to Primary Delivery Point(s) up to the sum of the Maximum Daily Delivery
Obligation(s) stated in the FT-A Agreement for those points of delivery.
3.3 Changing Primary Receipt and Delivery Points: Subject to availability of firm
capacity, Shipper may change the Primary Receipt or Delivery Points under its FT-A
Agreement pursuant to Sections 5.7 and 5.8 of the General Terms and Conditions of this
FERC Gas Tariff.