Gulf Crossing Pipeline Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/2008, Docket: RP09-61-000, Status: Effective
Original Sheet No. 1156 Original Sheet No. 1156
GENERAL TERMS AND CONDITIONS
Section 18
(Continued)
(b) The circumstances under which Gulf Crossing may issue an
OFO include but are not limited to:
(i) Any operating condition identified in Section 18.3
when such condition threatens safe operations or
system integrity such that issuance of a Critical
Period notice is inadequate to correct the condition.
An OFO issued pursuant to this Section shall be
terminated once the event giving rise to the OFO no
longer threatens the operational integrity of Gulf
Crossing's system.
(ii) The pressure on the system or a portion thereof
reaches a level that threatens the physical integrity
of the system. An OFO issued pursuant to this
Section shall be cancelled once pressures return to a
level that no longer threaten the physical integrity
of the system.
(iii) Emergency maintenance or repair of the system
including replacement of pipelines or portions
thereof, installation of taps, unscheduled testing of
storage fields or any other similar unscheduled
actions affecting the capacity of any portions of
Gulf Crossing's system.
(iv) A sudden failure or damage to Gulf Crossing's
facilities, an immediate loss of a large supply or
delivery point, or some other event that dramatically
affects Gulf Crossing's pipeline capacity or ability
to provide scheduled services.