Original Sheet No. 1150 Original Sheet No. 1150
GENERAL TERMS AND CONDITIONS
Section 18
18. OPERATIONAL PLANS/EMERGENCY PROCEDURES
18.1 Gulf Crossing has two operational plans designed to protect the
operational integrity of its pipeline system. These operational
plans include a) Critical Period (Section 18.3) and b)
Operational Flow Orders (Section 18.4):
(a) A Critical Period should be viewed as an early warning
mechanism. Events may dictate that normal operating
conditions are deteriorating so that additional operational
procedures are warranted to protect the system's integrity.
Time and conditions permitting, a Critical Period notice
will be the first operational plan utilized by Gulf
Crossing to protect the operational integrity of its
system.
(b) If Gulf Crossing determines that a Critical Period
notice is inadequate to correct conditions, if time and
conditions do not allow for the issuance of a Critical
Period notice, or if Gulf Crossing is unable to provide all
or any part of the services on its system, an Operational
Flow Order may be issued directing parties to take or not
take specific actions to alleviate conditions that threaten
Gulf Crossing's system integrity.
18.2 Summary of Operational Plans
See chart on Sheet No. 1151.
Except where protection of system integrity is required, Gulf
Crossing will issue a Critical Period notice prior to issuing an
OFO.