Gulf Crossing Pipeline Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/2008, Docket: RP09-61-000, Status: Effective
Original Sheet No. 900 Original Sheet No. 900
GENERAL TERMS AND CONDITIONS
Section 13
13. ALLOCATIONS
13.1 Allocation Method(s)
All meter stations will be allocated on a daily basis. Gulf
Crossing will report the daily operational allocation within one
Business Day after the end of the Gas Day using scheduled
quantities if better data is not available.
Gulf Crossing shall use Operator and Customer predetermined
allocation agreement (PDA) methods for allocating Measured
Quantities at all points on Gulf Crossing's system. A PDA is
not needed at receipt and delivery points on Gulf Crossing's
system where an OBA has been executed.
13.2 Predetermined Allocation Methodology
The upstream or downstream party providing the point confirmation
should submit the PDA to Gulf Crossing after or during
confirmation and before the start of the Gas Day. The party
responsible for custody transfer (the party performing the
measurement function) should provide the allocation.
Gulf Crossing will accept NAESB standard methodology types from
the upstream or downstream custody transfer party who is
providing the point confirmation before the start of the Gas Day.
Gulf Crossing shall send back "confirmation" of receipt of the
pre-determined allocation within 15 minutes.
Only one PDA allocation methodology can be applied per allocation
period. A new allocation detail may be needed when a nomination
changes. An Operator PDA submitted after any Gas Day is subject
to Gulf Crossing's approval, must be submitted by paper copy via
facsimile or e-mail and, unless prior authorization is received
from all affected Customer(s), must contain the signatures of all
affected Customer(s) signifying agreement to the proposed
changes.