Gulf Crossing Pipeline Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/2008, Docket: RP09-61-000, Status: Effective
Original Sheet No. 104 Original Sheet No. 104
FTS RATE SCHEDULE
(Continued)
such transactions do not require the use on an aggregate basis of
incremental fuel. Any Zero Fuel Transactions approved by the
Commission will be posted to the Gulf Crossing Web Site. If at
any time any such approved Zero Fuel Transaction begins utilizing
fuel, Gulf Crossing may remove such transaction from its Web Site
listing and reinstate fuel charges.
(c) Gulf Crossing shall have the unilateral right to file with the
appropriate regulatory authority and make changes effective in
(i) the filed rates and charges applicable under this FTS Rate
Schedule, including both the level and design of such rates and
charges; and/or (ii) this FTS Rate Schedule and the General Terms
and Conditions. Customer shall have the right to protest or
contest the aforementioned filings.
6. OTHER PROVISIONS
Customer shall reimburse Gulf Crossing for all fees required by FERC or
any governmental or regulatory body related to the specific service
provided under this FTS Rate Schedule and/or taxes on the delivery of
Gas into Gulf Crossing's pipeline within ten (10) Days from receipt of
Gulf Crossing's invoice to Customer for payment. Such fees shall
include, but are not limited to, filing, reporting, and application
fees.
Customer must have good title to all Gas or a current contractual right
to acquire title, a right to ship the Gas, and must enter into all
necessary arrangements to assure that upstream and downstream
transportation, if any, will be in place prior to the commencement of
service.
Unless otherwise provided herein, nothing shall require Gulf Crossing
to install equipment or facilities to facilitate a requested
transaction.