Destin Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1998, Docket: CP96-655-003, Status: Effective
Original Sheet No. 56 Original Sheet No. 56 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
5. MEASURING EQUIPMENT
5.1 COMPANY's Measuring Equipment
Orifice meter installation shall conform to the recommendations for
design and installation contained in A.G.A. Report #3 (API MPMS 14.3).
Turbine meter installations shall conform to the recommendations for
design and installation contained in Gas Measurement Committee Report
No. 7 of the American Gas Association. Other primary metering
devices, including but not limited to positive displacement and rotary
meter installations, shall conform to generally accepted engineering
practices in the industry.
5.2 Testing Measuring Equipment
COMPANY shall test its measuring equipment and temperature measuring
devices installed as provided in Sections 4.2(d) and (e), 4.3 and 5.1
hereinabove at such reasonable intervals as may be determined by
COMPANY. COMPANY will notify SHIPPER in time to permit SHIPPER to
witness such test if SHIPPER so elects. Measuring equipment shall be
subject to check tests and inspection by SHIPPER, on prior notice, at
reasonable times.
5.3 Correction of Measurement Errors
(a) Correction of Metering Errors. If COMPANY's measuring
equipment installed under Section 5.1 hereinabove or any other
equipment installed under Sections 4.2(d) and (e) and 4.3
hereinabove is found to be inoperative or inaccurate, such
equipment shall be adjusted to register correctly, and the
amount of inaccuracy shall be determined by the most accurate
method feasible. If the inaccuracy shall have resulted in an
error of more than 1% in the measurement of gas, then the
calculated deliveries of gas shall be adjusted to compensate