Dauphin Island Gathering Partners
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/23/1997, Docket: RP98- 17-000, Status: Effective
Substitute Original Sheet No. 201 Substitute Original Sheet No. 201 : Effective
Superseding: Original Sheet No. 201
(iv) whether the bidder is a prearranged Acquiring
Shipper;
(v) the term for which the bid is being made if
the Offer allows bids on less than the term
offered;
(vi) if the Offer allows bids on less than the full
capacity offered, the transportation capacity
requested at each Delivery and Receipt Point,
and for each Path;
(vii)if allowed by the Offer, whether the bid is
contingent on the award of capacity on an
upstream or downstream pipeline system, the
name of the pipeline and the bid number;
(viii)if other contingencies are allowed by the
Offer, whether the bid is subject to one of
the contingencies allowed by the Offer; and
(ix) the information required by Section 250.16 of
the Commission's Regulations to the extent
necessary to allow Transporter to comply with
its reporting/posting requirements under
Section 250.16.
Bids shall be binding until written or electronic
notice of withdrawal is received by the Transporter.
Bids cannot be withdrawn after the bid period ends.
A bidder may withdraw its bid on an Offer at any
time prior to the end of the bid period, but any
subsequent bids submitted by the bidder on that
Offer during the bid period must be equal to or
higher than the bidder's previous bid(s).
(h) Transporter's Initial Review: Upon receipt of all
bids, Transporter shall engage in an initial review
to determine whether a bid will be deemed eligible
for consideration. Any bid deemed ineligible
pursuant to this Subsection 19.6(h) shall be
eliminated from consideration. A bid shall be
deemed ineligible if: