Dauphin Island Gathering Partners
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/23/1997, Docket: RP98- 17-000, Status: Effective
Substitute Original Sheet No. 197 Substitute Original Sheet No. 197 : Effective
Superseding: Original Sheet No. 197
(xv) the economic criteria to be utilized by
Transporter in determining the "best bid"
shall be one of the following (i) highest
rate, (ii) net revenue, or (iii) present
value. For the capacity release business
process timing model, only the following
methodologies are required to be supported by
Transporter and provided to Releasing Shipper
as choices from which to select and, once
chosen, should be used in determining the
awards from the bid(s) submitted. They are:
1) highest rate, 2) net revenue and 3) present
value. Other choices of bid evaluation
methodology (including other Releasing Shipper
defined evaluation methodologies) can be
accorded similar timeline evaluation treatment
at the discretion of the Transporter.
However, the Transporter is not required to
offer other choices or similar timeline
treatment for other choices, nor, is the
Transporter held to the timeline should the
Releasing Shipper elect another method of
evaluation; and
(xvi)a nondiscriminatory tie breaker to be utilized
in determining the "best bid" in the event two
or more bids generate the same results. The
tie breaker shall be objective and non
discriminatory, and must be able to be applied
by Transporter.
(d) Prearranged Release: A Releasing Shipper must
identify in its Offer any prearranged Acquiring
Shipper. Such Acquiring Shipper must meet all of
the requirements established for bidders pursuant to
Subsection 19.6(e) and the prearranged Acquiring
Shipper shall submit its bid in accordance with
Subsections 19.6(f) and (g). If the prearranged
Acquiring Shipper tenders a bid for the offered
capacity at the maximum reservation charge
applicable to the Releasing Shipper's service, for
the full capacity and term offered by the Releasing
Shipper and satisfies all of the requirements of
Subsections 19.6(e) and (g), that bid shall be
deemed the "best bid". Transporter shall post on
its EBB by 9:00 a.m. CCT the day of nomination the
identity of the prearranged Acquiring Shipper, and
the terms upon which the capacity was released for