Dauphin Island Gathering Partners
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2002, Docket: RP02-423-000, Status: Effective
First Revised Sheet No. 167 First Revised Sheet No. 167 : Effective
Superseding: Original Sheet No. 167
12. DETERMINATION OF RECEIPTS AND DELIVERIES
12.1 General:
(a) Transporter shall accept NAESB-approved predetermined
allocation methodology ("PDA")types from the upstream or
downstream custody transfer party who is providing the point
confirmation. The upstream or downstream party providing
the point confirmation should submit the PDA to the
allocating party after or during confirmation and before
start of gas day. Only one PDA shall be applied per
allocation period. If there are no additions in nominations
by a Shipper at a point or other changes, the current PDA
will stay in effect as submitted until it is changed
pursuant to the foregoing procedures. The allocating party
should send back "confirmation" of receipt of the PDA within
15 minutes. There is no need to submit a PDA if Transporter
has an OBA in effect for a point.
(b) The same standard PDA should be available for use at all
points. The types of PDA are a list from which two parties
may agree as provided in Subsection 12.2(b). If the two
parties cannot agree upon a PDA, pro rata based upon
confirmed nominations should be used as the default method.
The party responsible for custody transfer (the party
performing the measurement function) should provide the
allocation.
(c) Shipper hereby agrees that Transporter shall have the right
to rely conclusively on the PDA for the purposes of
determining the daily quantities of gas received or
delivered by Transporter for the account of Shipper at each
point.
(d) When the PDA is rank, swing or percentage, a new allocation
detail may be needed when a nomination changes.