Dauphin Island Gathering Partners

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2002, Docket: RP02-423-000, Status: Effective

First Revised Sheet No. 113 First Revised Sheet No. 113 : Effective

Superseding: Original Sheet No. 113

Agreement the total of Shipper's scheduled quantities at Receipt

Points is less than the total of the MDQ for all Paths when both

are summed over the number of days in the then current month prior

to the date of the make-up nomination.

 

(t) The terms "Maximum Daily Delivery Quantity" or "MDDQ" shall mean

the maximum daily quantity of gas in Dth that Transporter shall

deliver to or for the account of Shipper at each Delivery Point on

each day during the term of and in accordance with Shipper's

Transportation Service Agreement, as set forth on Exhibit "A" to

the Transportation Service Agreement. The MDDQ shall be equal to

the MDQ for the applicable Path.

 

(u) The terms "Maximum Daily Receipt Quantity" or "MDRQ" shall mean

the maximum daily quantity of gas in Dth that Transporter shall

receive from or for the account of Shipper at each Receipt Point

on each day during the term of and in accordance with Shipper's

Transportation Service Agreement, as set forth on Exhibit "A" to

the Transportation Service Agreement. The MDRQ shall be equal to

the MDQ for the applicable Path.

 

(v) The term "month" shall mean the period beginning at 9:00 a.m. CCT

on the first day of the calendar month and ending 9:00 a.m. CCT on

the first day of the next succeeding calendar month.

 

(w) The terms "natural gas" or "gas" shall mean any mixture of

hydrocarbons consisting essentially of methane, other

hydrocarbons, and noncombustible gases in a gaseous state which is

extracted from the subsurface of the earth in its natural state

meeting the quality specifications set forth in Section 2 hereof.

 

(x) The term "Negotiated Rate" shall mean the rate agreed to by

Shipper and Transporter which may be less than, equal to or

greater than the Maximum Rate but shall not be less than the

Minimum Rate set forth on the applicable currently effective

sheets of Transporter's FERC Gas Tariff. The Negotiated Rate may

be based on a rate design other than straight fixed variable and

may include a minimum quantity.

 

(y) The term "new facilities" shall mean those facilities on

Transporter's system which were not included in the certificate

filing in Docket CP98-6-000 which are necessary in order for

Transporter to provide the transportation service(s) that a

Shipper requests by use of the Service Request Form (for example,

a new, additional Receipt and/or Delivery Point).

 

(z) The term "Nomination Period" shall mean a period of time a

customer includes in a nomination for gas service.