Crossroads and those of Shipper or Shipper's designee, and
shall be designated Primary or Secondary, as set forth in
the Service Agreement. The Shipper or Shipper's designee
shall prioritize, by contract number on the immediate
upstream Pipeline, the order in which natural gas is to be
received into Crossroads for each Primary and Secondary
Receipt Point utilized by the Shipper. In the absence of any
contrary designation by Shipper, the Shipper's gas received
at the Receipt Point(s) will be allocated based on the actual
quantity of gas received for the Shipper at the Receipt
Point(s) as follows: first to all Firm Transportation
Contracts, designating the point as a Primary Receipt Point
according to their scheduled amounts up to the MDQ, then to
all Firm Transportation Contracts designating the point as
a Secondary Receipt Point according to the scheduled
amounts up to the MDQ, then to all Interruptible
Transportation Contracts, then to Firm Authorized Overrun
Service where the underlying contract designates the Point
as Primary, then to Firm Authorized Overrun Service where
the underlying contract designates the Point as Secondary,
then to all Interruptible Authorized Overrun Service, then
to all Gas Parking or Lending Service.
18.2 Shipper Contract Allocation: The allocation of gas
available for delivery by Crossroads for the Shipper will be
the actual quantity of gas received by Crossroads for the
Shipper. Shipper may designate a priority for allocation of
such actual receipts if such actual receipts are less than
scheduled amounts. In the absence of such a designation by
Shipper, the Shipper's actual quantity of Gas available for
delivery to the Delivery Point(s) will be allocated as
follows: first to all Firm Contracts designating the point
as a Primary Delivery Point according to the scheduled
amounts up to the MDQ, then to all Firm Contracts
designating the point as Secondary Delivery Point according
to the scheduled amounts up to their MDQ, then to all
Interruptible Contracts, then to all Firm authorized
overrun service where the underlying contract designates
the Point as Primary, then to all Firm authorized overrun
service where the underlying contract designates the point
as Secondary, then to all Interruptible authorized overrun
service, then to all Gas Parking or Lending Service.
18.3 Delivery Point(s): The Delivery Point(s) shall be the outlet
side of Crossroads' facilities at the point of
Interconnection between the facilities of Crossroads and
those of Shipper or Shipper's designee, and shall be
designated Primary or Secondary as set forth in the Service
Agreement.
(a) Crossroads Controlled Meter: Crossroads will deliver
the actual quantity of gas made available to be
delivered according to the priorities set out in
Section 18.2. The differences between the actual