Crossroads Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2002, Docket: RP02-255-000, Status: Effective
First Revised Sheet No. 593 First Revised Sheet No. 593 : Effective
Superseding: Original Sheet No. 593
INFORMATIONAL POSTING FORM FOR PREARRANGED ASSIGNMENTS
(Continued)
(e) This release will "Stand Alone." Yes ____ No ____ If not
"Stand Alone," please state all parcel numbers that must be accepted by the
Replacement Shipper (if parcel numbers are unknown due to manual
submission, then all releases that must be accepted as a package must be
submitted together in written format.
___________________________________________________________________________
___________________________________________________________________________
3. Releasor's Recall Rights. Releasor's recall rights shall be subject
to the following requirements:
(a) The frequency with which Releasor may recall the capacity
shall be:
___________________________________________________________________________
__________________________________________________________________________;
(b) The maximum duration of any such recall(s) shall be:
______________________________________________________________________; and
(c) The released capacity may_____ may not_____ be recalled on an
Intra-Day basis.
(d) The Replacement Shipper has ____ has not ____ the option to
accept the capacity after a recall for the remainder of the release.
4. Charges. All rates, charges and surcharges for the release to be
paid by Replacement Shipper to Releasor shall be (in absolute dollars and
cents or percent of maximum):
___________________________________________________________________________
___________________________________________________________________________