GENERAL TERMS AND CONDITIONS
(Continued)
(e) In the event Shipper does not provide the sworn statement as
required by this Section 16.5, or receives emergency relief on the basis of
any representation in such sworn statement that is determined to have been
materially false, then all of the quantities attributable to the adjustment
made by Transporter shall be billed to that Shipper, in addition to all
other charges, at a rate of $25 per dekatherm. All revenues attributable
to such $25 per dekatherm charge shall be credited, on a pro rata basis, to
those Shippers interrupted to a lower quantity as a result of the
anticipated sworn statement.
(f) To the extent Transporter's interruption of any Shipper
pursuant to this Section 16.5 would cause such Shipper to incur a penalty
due Transporter through no fault of Shipper, Transporter shall not assess
that penalty against that Shipper. This provision does not excuse Shipper
from taking all reasonable action necessary to remove itself from a penalty
situation.
(g) In the event emergency relief is provided pursuant to this
Section 16.5, Transporter shall post on its EBB the following information
within two hours after such relief has been granted: (1) the name of the
Shipper(s) whose request(s) for emergency relief have been granted; (2) the
date and the time when the emergency relief was initiated to the
Shipper(s); (3) the expected duration of the emergency; (4) the specific
location of the emergency; and (5) a brief description of the nature of the
capacity constraint and the emergency.
(h) Transporter will maintain, and make available for inspection
by any interested party, all written and electronic information generated
in connection with the granting or denial of emergency relief pursuant to
this Section 16.5, including but not limited to the sworn statement and
facsimile transmissions required by Section 16.5(b), and the EBB notice
required by Section 16.5(g).
16.6 Interruptions Due To Upstream Or Downstream Facilities.
In instances in which an interruption on Transporter is necessitated
by an interruption of service on an upstream or downstream facility and
Transporter can identify the specific shipper on Transporter’s system whose
upstream or downstream service is interrupted, Transporter will interrupt
such specific Shipper.