Crossroads Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2001, Docket: RP02- 14-000, Status: Effective
Original Sheet No. 152 Original Sheet No. 152 : Superseded
GENERAL TERMS AND CONDITIONS
(Continued)
(b) A potential Replacement Shipper responding to the posting of a Release Notice shall be
permitted to bid a quantity and a term of service different from those specified in the posted Release
Notice; provided, however, that a Bidder shall not be permitted to bid a quantity or a term of service lower
than any minimum quantity or term disclosed and posted by Releasor in the Release Notice. Bidders must
accept all other conditions set forth in the Release Notice.
(c) Bids shall be submitted by potential Replacement Shippers without bidders knowing the
identities of other bidders. Bidders may submit multiple bids, each higher than the previous bid, during
the posting period established pursuant to Section 14.2(e) above.
(d) All bidders must (i) have pre-qualified under Transporter's creditworthiness standards, (ii)
appear on Transporter's Approved Bidders List, and (iii) where execution of an Assignment Agreement will be
required within five days of its transmission by Transporter, have executed an Electronic Contracting
Agreement with Transporter, as required by Section 3 (Requests for Service) and Section 5 (Service Agreement
and Electronic Contracting) of the General Terms and Conditions.
(e) Releasors that have (i) Service Agreements with Transporter and with Columbia Gas
Transmission Corporation, or (ii) multiple Service Agreements with Transporter may post Release Notices for
capacity under such Service Agreements with a "Stand-Alone" or "Not Stand Alone" indicator. Potential
Replacement Shippers must submit bids on all parcels that "Stand Together".
(f) All bids for capacity release transactions of one (1) year or more in length shall
neither exceed the maximum rates nor be less than the minimum rates permitted by the Commission for the
released services. Bids for capacity release transactions of less than one (1) year during the period
between March 27, 2000 and September 30, 2002 may exceed the maximum rates but shall not be less than the
minimum rates permitted by the Commission for released services. Bids for capacity offered at a one-part
volumetric rate (which shall apply only to the reservation portion of the rate) shall not exceed a maximum
rate calculated by converting the applicable maximum reservation charge into a volumetric charge at a 100
percent load factor plus the applicable commodity charges; provided, however, such bids may exceed the
maximum rate during the period between March 27, 2000 and September 30, 2002, if the capacity release is for
a period of less than one (1) year.