Dominion Cove Point LNG, LP
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2003, Docket: RP03-341-000, Status: Effective
Original Sheet No. 269 Original Sheet No. 269 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
19. MEASUREMENTS AND TESTS FOR DELIVERY OF NATURAL GAS (Continued)
(i) (2) Unless otherwise agreed to in writing, or unless gas is being received from an
interstate pipeline company which has an approved FERC Gas Tariff governing
measurement of gas it delivers, Operator will install, operate and maintain
measuring stations and equipment by which the quantities of Natural Gas received
by Operator are determined.
(3) Where measuring stations and associated equipment are installed, maintained or
operated by Buyer, they shall be designed and installed in accordance with all
engineering and other standards and practices as specified by Operator, and
Operator shall have the right to be present and inspect the installation of all
such measuring stations and equipment to insure compliance with such standards
and practices. Buyer and Operator shall agree in writing to reasonable standards
and practices by which such measuring stations and associated equipment shall be
operated by Buyer as required to insure the continuous accuracy thereof and as
required by Operator to provide Operator with continuous, real-time measurements
and flows.
(4) Buyer and Operator shall have the right to be present at the time of any
installation, reading, cleaning, change of charts, repair, inspection, test,
calibration, or adjustment made in connection with Operator's or Buyer's
measuring stations or equipment used to measure gas received by Operator for
Buyer or delivered by Operator to Buyer.
(5) The records from measuring equipment shall remain the property of the operator of
such equipment, but upon request the operator will submit to the other party its
records, together with calculations therefrom, for inspection, subject to return
within thirty (30) days after receipt thereof.
(6) Orifice meters shall be installed and operated, and gas quantities computed, in
accordance with AGA Report No. 3, American National Standards Institute ANSI/API
2530, "Orifice Metering of Natural Gas", revised Second Edition, 1985, applied in
a practical and appropriate manner, except that the supercompressibility factor
shall be calculated in accordance with Section 19(h) above.
(7) Turbine meters shall be installed and operated, and gas quantities computed, in
accordance with AGA Transmission Measurement Committee Report No. 7, "Measurement
of Gas by Turbine Meters", 1985 Edition, applied in a practical and appropriate
manner, except that the supercompressibility factor shall be calculated in
accordance with Section 19(h) above.
(8) Diaphragm meters shall be installed and operated, and gas quantities computed, in
accordance with ANSI 8109.1 or 8109.2, "Diaphragm Type Gas Displacement Meters",
1986, applied in a practical and appropriate manner, except that the
supercompressibility factor shall be calculated in accordance with Section 19(h)
above.
(9) Rotary meters shall be installed and operated, and gas quantities computed, in
accordance with ANSI 8109.3, "Rotary Type Gas Displacement Meters", 1986, applied
in a practical and appropriate manner, except that the supercompressibility
factor shall be calculated in accordance with Section 19(h) above.