8. NATURAL GAS QUALITY (Continued)
(h) (v) No water or mercury;
(vi) No active bacteria or bacterial agent, including but limited to, sulphate
reducing bacteria or acid producing bacterial; and
(vii) No hazardous or toxic substances.
(viii) In the event it becomes necessary for Operator to operate nitrogen injection
facilities, Operator's nitrogen injection capacity shall be allocated, if
necessary, among Buyers in the following order:
1. First, to Buyers scheduling withdrawals during the Withdrawal Season
pursuant to Section 3(a) of Rate Schedule FPS-1, FPS-2 and FPS-3. Such
Buyer may take delivery of a quantity of gas up to the MCPQ at a daily rate
of up to one hundred fifteen percent (115%) of Buyer's MDPQ; and
2. Then, ratably as a class to Buyers scheduling withdrawals pursuant to Rate
Schedule LTD-1; and
3. Then, ratably as a class to Buyers scheduling withdrawals pursuant to the
2004 Terminal Expansion; and
4. Then, ratably as a class to Buyers scheduling withdrawals pursuant to
Section 2.A. of Rate Schedule LTD-1 (ISQ); and
5. Then ratably as a class to all Buyers scheduling withdrawals pursuant to
the Authorized Overrun provisions of Rate Schedules LTD-1, LTD-2, FPS-1,
FPS-2, or FPS-3; and
6. Then, ratably as a class to Buyers scheduling withdrawals pursuant to Rate
Schedule LTD-2.
Cove Point shall not be obligated to receive any LNG that does not meet these
standards.
(i) Measurement of Quantity of LNG Received from Buyer's LNG Tankers. Buyer shall
measure, or cause to be measured, the quantity of LNG received by Operator from
Buyer's LNG tanker(s) in accordance with the following provisions:
(i) The volume of LNG received by Operator and reflected as an increase in Buyer's
Liquefied Gas Balance shall exclude the amount of vapor returning to Customer's
vessel during unloading of LNG. Operator shall have no obligation to receive
quantities that cause Buyer to exceed the volume equivalent of its MCSQ (or
that part of its MCSQ allocated to Buyer during periods of constrained
capacity).
(ii) The volume of cubic meters of LNG received by Operator shall be measured in
metric units by gauging of the liquid in the tanks of Buyer's LNG tanker(s).
Buyer shall cause the first gauging to be made after the Captain of Buyer's LNG
tanker has given his notice of readiness to unload and before starting the
pumps. A second gauging shall take place immediately after completion of
unloading. Representatives of Buyer and Operator shall have the right to be
present at such gaugings but the absence of a representative shall not prohibit
any gauging.