Appalachian Gathering System

 

 

11D.2 Gathering System Measurement (continued)

 

cost of such facilities prior to Pipeline

commencing or continuing service hereunder.

 

2. Pipeline shall not be required to verify the

accuracy of such equipment more frequently

than once every ninety days; and

 

3. The meter correction period shall not be

limited to the period established in GT&C Section

4.9, above.

 

E. For any Appalachian Receipt Point shared with other

Customers, Customer must provide or cause to be

provided a predetermined allocation, consistent

with the most current form as posted on Pipeline's

Electronic Bulletin Board.

 

11D.3 Pressure.

 

A. If the pressure of Customer's gas at a Receipt

Point is or becomes too high for the safe and

efficient operation of Pipeline's system in the

vicinity of the receipt point, Customer shall upon

Pipeline's written request and at Customer's sole

expense, regulate the pressure or control the flow

of gas to reduce such pressure and install, operate

and maintain necessary equipment and facilities to

protect Pipeline's system and connected wells and

other facilities from over-pressurization resulting

from any cause.

 

B. Customer shall operate his facilities in a

reasonable and prudent manner. Pipeline shall not

be responsible for, and Customer shall indemnify

and hold Pipeline harmless from, any damages or

liability for injury to, or death of persons or

damage to property of Pipeline or third persons

resulting from Customer's failure to install such

equipment or its failure to maintain and operate

properly such facilities, provided that Pipeline

will not be indemnified to the extent of its own

negligence, willful misconduct, or fraud in causing

such damage or liability.

 

C. Customer shall make deliveries to Pipeline against

the existing pressure in Pipeline's facilities.

Pipeline shall not be obligated to lower such line

pressure by compression or otherwise, and

Customer shall not