Dominion Transmission, Inc.
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/23/2000, Docket: RP00-555-000, Status: Effective
Original Sheet No. 655 Original Sheet No. 655 : Effective
DPO RATE SCHEDULE
Delivery Point Operator Service
7.9 The DPO will notify the Pipeline prior to any Day on
which it seeks to modify or release any one of the
Subject Service Agreements to other than a CSC,
provided however, that the DPO is not required to
notify the Pipeline if it retains full rights to recall
its service entitlement from the assignee.
7.10 The DPO and Pipeline shall both make personnel
available at all times, in order to perform the
arrangements as described in this Rate Schedule.
8. OPERATIONAL FLOW ORDERS
8.1 A DPO receiving service under this Rate Schedule may be
subject to an operational flow order as set forth in
detail in Section 11B of the General Terms and
Conditions of this Tariff. Subject to all applicable
limitations set forth in Section 11B, upon the issuance
of an OFO, the DPO must take the actions set forth in
the OFO.
8.2 This Section 8 is intended solely to provide
information as to OFOs that Pipeline may issue to DPO
under this rate schedule and the actions that DPO may
be required to take. Nothing in this Section 8 shall
enlarge or diminish Pipeline's rights to issue any OFO
described in any other section of this Tariff.
9. GENERAL TERMS AND CONDITIONS
The General Terms and Conditions of Pipeline's
effective FERC Gas Tariff, and any revisions thereof that
may be proposed and made effective from time to time
hereafter, to the extent not inconsistent with the
provisions of the Service Agreement or this Rate Schedule,
shall apply to and are made a part of this Rate Schedule.