Dominion Transmission, Inc.

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/23/2000, Docket: RP00-555-000, Status: Effective

Original Sheet No. 402 Original Sheet No. 402 : Effective

 

 

 

GSS-II RATE SCHEDULE

General Storage Service

 

F. Any Applicable Penalties. For excess daily injection

overruns, injections in excess of Storage Capacity,

and excess withdrawals, as required by Section 35.3 of

the General Terms and Conditions.

 

G. Any other applicable rates, charges, and penalties as

set forth in the General Terms and Conditions.

 

H. Additionally, for natural gas transported to Customers

under this Rate Schedule who have agreed to pay

additional charges based upon Pipeline's joint

ownership with Texas Eastern of transmission

facilities effectuating delivery at the Chambersburg

Delivery Point, Customer shall pay Pipeline each month

the applicable charges per Dt as set forth in the

then-effective Sheet Nos. 32 and 33 of this Tariff

(FT-GSS-II).

 

5.2 Fuel Retention. Pipeline will retain the percentage of gas

received for injection set forth on Sheet No. 35 as the

Storage Service Fuel Retention Percentage.

 

5.3 In the event Customer has failed to meet the minimum

turnover requirements of Section 8.7 below, Pipeline shall

retain the quantity of gas required by Section 35.3.D of

the General Terms and Conditions.

 

5.4 Notwithstanding the provisions of Sections 5.1-5.3, for any

Day during the Summer Period that a Customer gives Pipeline

both (a) notice under Section 7 of this Rate Schedule for

injections into storage, and (b) notice under Section 8 of

this Rate Schedule for withdrawals from storage, to the

extent that quantities tendered for injection and the

quantities requested to be withdrawn are equal and such

quantities are redelivered by Pipeline at the same

injection/withdrawal point for subsequent transportation,

the injection/withdrawal charges in Section 5.1 above shall

not apply. Instead, there shall be a Usage Charge of $0.01

per dekatherm times the quantity of gas tendered for

injection plus $0.01 per dekatherm times the quantity of

gas requested for withdrawal. To the extent that such

quantities tendered for injection and requested for

withdrawal are not equal, the injection/withdrawal charges

reflected on the currently effective Sheet No. 35 shall

apply to the net difference.