3. RATE
(a) Shipper shall agree to pay for all service(s) rendered under the executed FT
Service Agreement in accordance with this Rate Schedule FT, or any
superseding rate schedule(s) applicable to such service, as filed with the Federal
Energy Regulatory Commission or its successor, and as may be lawfully revised
from time to time. The initial transportation rates and all subsequent revisions
to such rates shall be provided in writing to Shipper by CVC.
(b) The maximum and minimum Transportation Rate shall be the Current Effective
Rate shown on the effective Tariff Sheet No. 5 in Volume No. 1 of this Tariff.
(c) CVC may charge any rate between the maximum and minimum rate stated on
Sheet No. 5 on a non-discriminatory basis. Shipper's delivery of gas quantities
to CVC after the effective date of any discounted rates shall be deemed
acceptance by Shipper of such rates; provided, however, that this provision
does not limit a Shipper's right to receive any refunds to which such Shipper
may otherwise be entitled. The rate for reassigned capacity under this rate
schedule will be established pursuant to Article 11 of the General Terms and
Conditions. CVC shall file all required reports with the Federal Energy
Regulatory Commission.
(d) CVC is not required to offer or provide service at any rate less than the
maximum rate or charge specified on Tariff Sheet No. 5.
(e) The charges for service under this rate schedule shall also include any other
allocated costs or surcharges permitted by the Federal Energy Regulatory
Commission.
(f) Fuel and loss is to be reimbursed in kind and is separately stated for the
service.
(g) CVC shall be entitled to submit a limited Section 4 of the Natural Gas Act
filing to reflect changes to its compression, capacity, and fuel-use costs and
adjust the billing determinants, and shall recover compressor lease expenses
and fuel-use amounts through an event-driven, deferred account tracking
mechanism.
(i) CVC shall track any changes in lease costs and/or capacity as a result
of an increase or decrease in compression. CVC also shall track any
resulting cost adjustments.