Columbia Gulf Transmission Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/1996, Docket: RP96-261-000, Status: Effective
Second Revised Sheet No. 400 Second Revised Sheet No. 400 : Effective
Superseding: First Revised Sheet No. 400
OPERATIONAL BALANCING AGREEMENT (Cont'd)
2.2 During any given month, estimated meter quantities (mcf) shall be used by each Party on a
daily basis to determine the estimated Daily Operational Imbalance, if any, at the Interconnection Point(s)
for any given day. The Parties shall promptly make such physical flow adjustments as may be necessary in order
to prevent, reduce or eliminate any Daily Operational Imbalance. The daily variance in the estimated Daily
Operational Imbalance should not exceed five percent (5%) of the aggregate quantities nominated for the day,
nor two percent (2%) of the aggregate monthly quantities.
2.3 The sum of estimated Daily Operational Imbalances for each day in a given month shall
constitute the estimated Monthly Operational Imbalance for such month. By the fifth day of the month following
any given month in which an estimated Monthly Operational Imbalance arises, the measuring Party, as identified
on Exhibit "A", will notify the other Party as to the estimated Monthly Operational Imbalance for the prior
month, and the Parties shall promptly make such physical flow modifications as may be necessary to reduce or
eliminate any such Monthly Operational Imbalance.
2.4 The actual MMBtu at the Interconnection Point(s) each month will be determined and the actual
Monthly Operational Imbalance communicated by the allocating Party to the other Party in writing as soon as
possible, but in no case later than the fifteenth day of the month following the month in which the actual
Monthly Operational Imbalance arises. The Parties shall correct any actual Monthly Operational Imbalance by
the end of the month within which the actual Monthly Operational Imbalance is determined, or within such
longer period of time as may be agreed to by the Parties. Deliveries of gas to correct actual Monthly
Operational Imbalances may be made between the parties at the Interconnection Point(s) set forth on Exhibit
"A", or at any other point of interconnection between the respective facilities of the Parties as may be
mutually agreed to by the Parties.
2.5 Any gas volumes received and delivered to correct an Operational Imbalance shall be adjusted
for variations in Btu content in accordance with the applicable provisions of the FERC Gas Tariff of the Party
which received the gas. Measurement of gas for all purposes hereunder shall be in accordance with the
provisions set forth in the measuring Party's then effective FERC Gas Tariff.
2.6 In the event that a capacity constraint occurs on either Party's pipeline system which
results in curtailment of deliveries through an Interconnection Point, the Party on whose system the constraint
has occurred shall determine the appropriate reallocation of quantities due to curtailment as pursuant to the
provisions of Article I. If the constraint occurs at the Interconnection Point, the Party which owns the meter
at the Interconnection Point shall be deemed to have the constraint on its system.
ARTICLE III
TERM
3.1 This Agreement shall be effective and the procedures set forth in this Agreement shall be
implemented as of the day and year first above written, and shall continue in effect month-to-month thereafter;
provided, however that either Party may terminate this Agreement at any time by giving forty-eight (48) hours
prior written notice of termination to the other Party, to be effective at the end of the month of such
notification.