Columbia Gulf Transmission Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 06/01/1997, Docket: RP97-166-004, Status: Effective

Original Sheet No. 389A Original Sheet No. 389A : Effective





6. Contingent Bids. Contingent bids for the released capacity (check one) ___ will or ___ will

not be permitted. If contingent bids will be permitted, the terms and conditions of acceptable

contingencies -- including the manner in which such contingent bids will be evaluated -- are as follows:




7. Maximum Reservation Charge. The maximum reservation charge (including demand-type

surcharges) applicable to the released capacity is: __________________________.


8. Posting Period. The date and time at which this Release Notice shall be posted on

Transporter's EBB shall be: Date: _______________ Time: ______________. Bidding shall commence at the time

of posting and shall continue until: Date: ______________ Time: ______________ (must comply with the minimum

established in the General Terms and Conditions Section 14.2(d)).