Columbia Gulf Transmission Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-575-000, Status: Effective

Tenth Revised Sheet No. 318 Tenth Revised Sheet No. 318

Superseding: Ninth Revised Sheet No. 318

 

(For FTS-1 and FTS-2 Rate Schedules) Revision No. __________

 

Appendix A to Service Agreement No. _______________

Under Rate Schedule ______________

between Columbia Gulf Transmission Company (Transporter)

and ______________________________ (Shipper)

 

Transportation Demand

 

Begin End Transportation Recurrence

Date Date Demand Dth/Day Interval

 

 

(If subject to FTS-2 Rate Schedule Section 2(g), Check Here: ___)

 

Primary Receipt Points

 

 

Begin End Measuring Measuring Maximum Daily Recurrence

Date Date Point No Point Name Quantity (Dth/day) Interval

 

Primary Delivery Points

 

Begin End Measuring Measuring Maximum Daily Recurrence

Date Date Point No Point Name Quantity (Dth/day) Interval

 

 

The Master List of Interconnects (MLI) as defined in Section 1 of the General Terms and Conditions is

incorporated herein by reference for purposes of listing valid secondary interruptible receipt points and

delivery points.

 

Transporter and Shipper have mutually agreed to the following maximum or minimum pressure commitments:

________________________________________________________________________________________________________________

________________________________________________________________________________________________________________

 

____Yes ____No (Check applicable blank) Transporter and Shipper have mutually agreed to a Regulatory

Restructuring Reduction Option pursuant to Section 34 of the General Terms and Conditions of Transporter's FERC

Gas Tariff

 

____Yes ____No (Check applicable blank) Shipper has a contractual right of first refusal equivalent to the right

of first refusal set forth from time to time in Section 4 of the General Terms and Conditions of Transporter's

FERC Gas Tariff.

 

____Yes ____No (Check applicable blank) All gas shall be delivered at existing points of interconnection within

the Maximum Daily Quantity, as applicable, set forth in Transporter's currently effective Rate Schedule ___

Appendix A with Shipper, which for such points set forth are incorporated by reference.

 

____Yes ____No (Check applicable blank) This Service Agreement covers interim capacity sold pursuant to the

provisions of General Terms and Conditions Section4.2(j). Right of first refusal rights, if any, applicable to

this interim capacity are limited as provided for in General Terms and Conditions Section 4.2(j).

 

CANCELLATION OF PREVIOUS APPENDIX A

 

Service changes pursuant to this Appendix A, Revision No. _____ shall commence as of ___________, 20_____.

This Appendix A, Revision No. ____ shall cancel and supersede the previous Appendix A, Revision No. ____ to the

Service Agreement dated _______________, 20____. With the exception of this Appendix A, Revision No. ____, all

other terms and conditions of said Service Agreement shall remain in full force and effect.

 

(SHIPPER) COLUMBIA GULF TRANSMISSION COMPANY

 

By __________________________________ By __________________________________

 

Its __________________________________ Its __________________________________

 

Date __________________________________ Date __________________________________