Columbia Gulf Transmission Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2001, Docket: RP01-342-000, Status: Effective
Second Revised Sheet No. 133B Second Revised Sheet No. 133B : Effective
Superseding: Substitute First Revised Sheet No. 133B
GENERAL TERMS AND CONDITIONS (Continued)
(c) In the event that certain EBB functions effectively cannot be replaced, Transporter will by
Electronic Notice Delivery, telephone or facsimile transmission, provide notice to Shippers of the
suspension of that function pending restoration of EBB operations. The activities or functions to be
suspended for the duration of any EBB failure shall include: bidding for Transporter's available capacity
or released capacity; 24-hour turnaround times for contracting between Transporter and other parties, such
as Assignees of released capacity; and current capacity information, balancing data, or other operational
information.
2.4 Information Available. The EBB will permit parties to obtain:
(a) Information concerning the availability of capacity from Transporter for firm and interruptible
transportation from each receipt point to each point of delivery and capacity available through capacity
release from receipt points to delivery points;
(b) A listing of the points of receipt on Transporter's system; and
(c) Transporter's currently effective FERC Gas Tariff, Second Revised Volume No. 1.
(d) On-line Help through a feature that provides user support and can be accessed in all areas of
the EBB.