Columbia Gas Transmission LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/03/2009, Docket: RP09-340-000, Status: Effective
Original Sheet No. 511 Original Sheet No. 511
[For OPT Rate Schedule] Revision No. ________
Appendix B to Service Agreement No. ____________
Under Rate Schedule OPT
Segmentation Agreement
between Columbia Gas Transmission, LLC (Transporter)
and ________________________________________ (Shipper)
Transportation Demand
Begin End Transportation Recurrence
Date Date Demand Dth/day Interval
[Primary or Secondary] ________ Receipt Points
Begin End Scheduling Scheduling Measuring Measuring Maximum Daily Minimum Receipt Hourly Recurrence
Date Date Point No. Point Name Point No. Point_Name Quantity (Dth/day) Pressure Obligation (psig) Flowrate (Dth/hour) Interval
[Primary or Secondary] ________ Delivery Points
Begin End Scheduling Scheduling Measuring Measuring Maximum Daily Delivery Minimum Delivery Hourly Recurrence
Date Date Point No. Point Name Point No. Point_Name Obligation(Dth/day) Pressure Obligation (psig) Flowrate (Dth/hour) Interval
The Master List of Interconnects (MLI) as defined in Section 1 of the General Terms and Conditions of Transporter's Tariff is incorporated herein by reference for the
purposes of listing valid secondary interruptible receipt points and delivery points.
Service changes pursuant to this Appendix B shall become effective as of ______________, 20____. This Appendix B shall cancel and supersede the previous Appendix B
effective as of ______________, 20____, to the Service Agreement referenced above. With the exception of this Appendix B, all other terms and conditions of said
Service Agreement shall remain in full force and effect.
(SHIPPER) COLUMBIA GAS TRANSMISSION, LLC
By__________________________________ By______________________________________
Its_________________________________ Its_____________________________________
Date________________________________ Date____________________________________