Columbia Gas Transmission LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-792-000, Status: Pending
Fifth Revised Sheet No. 25 Fifth Revised Sheet No. 25
Superseding: Fourth Revised Sheet No. 25
Currently Effective Rates
Applicable to Rate Schedule FTS, NTS and NTS-S
Rate Per Dth
Transportation Cost Electric Power Line Annual Total
Base Rate Adjustment Costs Adjustment 1278 Charge Effective Daily
Tariff Rate Current Surcharge Current Surcharge Surcharge Adjustment Rate Rate
1/ 2/
Rate Schedule FTS
Reservation Charge 3/ $ 5.612 0.341 0.013 0.042 0.002 0.042 - 6.052 0.1990
Commodity
Maximum ¢ 1.04 0.23 0.04 0.58 0.08 0.01 0.17 2.15 2.15
Minimum ¢ 1.04 0.23 0.04 0.58 0.08 0.01 0.17 2.15 2.15
Overrun ¢ 19.49 1.35 0.08 0.72 0.09 0.15 0.17 22.05 22.05
Rate Schedule NTS
Reservation Charge 3/4/ $ 7.126 0.341 0.013 0.042 0.002 0.042 - 7.566 0.2488
Commodity
Maximum ¢ 1.04 0.23 0.04 0.58 0.08 0.01 0.17 2.15 2.15
Minimum ¢ 1.04 0.23 0.04 0.58 0.08 0.01 0.17 2.15 2.15
Overrun ¢ 24.47 1.35 0.08 0.72 0.09 0.15 0.17 27.03 27.03
1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Rate Adjustment (TCRA)
and Electric Power Costs Adjustment (EPCA), respectively. For rates by function, see Sheet No. 30A.
2/ ACA assessed where applicable pursuant to Section 154.402 of the Commission's Regulations.
3/ Minimum reservation charge is $0.00.
4/ The rates shown above for Service under Rate Schedule NTS shall be applicable to Service under Rate Schedule NTS-S except that the maximum Reservation
Fee shall be adjusted to reflect the applicable expedited period of gas flow (EPF) utilizing the following formula, rounded to 3 decimal places:
NTS-S = NTS * (24/EPF) where:
NTS-S = NTS-S Reservation Fee
NTS = Applicable NTS Reservation Fee
24 = Number of Hours in a Gas Day
EPF - MDQ/MHQ