Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Fifth Revised Sheet No. 380J Fifth Revised Sheet No. 380J
Superseding: Fourth Revised Sheet No. 380J
GENERAL TERMS AND CONDITIONS
(Continued)
17.3 Filing Procedures. The Annual Charge Adjustment shall be filed by
Transporter at least 30 days prior to the proposed effective date
unless, for good cause shown, lesser periods are allowed by valid
Commission Order.
The proposed effective date of filings shall be October 1 of each
calendar year.
17.4 Gas Quality Control Surcharge(s).
(a) As set forth in Section 3.5 of the General Terms and Conditions
of this Tariff, all Gas Delivered on the Valley Line (as
defined in Section 1.117 of the General Terms and Conditions of
the Tariff) must meet certain quality specifications.
Accordingly, all Deliveries on the Valley Line shall be subject
to a Valley Line Gas Quality Control ("Valley Line GQC")
surcharge related to the costs associated with maintaining the
Section 3.5 quality specifications. Firm service with Primary
Points of Delivery entitlements on the Valley Line shall be
charged Firm Valley Line GQC reservation and commodity
surcharges. Gas Delivered on the Valley Line under an
interruptible rate schedule, small customer rate schedule, or
firm service rate schedule on a Secondary Basis shall be
charged the Valley Line GQC commodity surcharge.
(b) As set forth in Section 3.5 of the General Terms and Conditions
of this Tariff, all Gas Delivered at the Derby Lake Point of
Delivery on the High Plains System (as defined in Section
8.3(b) of the General Terms and Conditions of the Tariff) and
on the 9B pipeline must meet certain quality specifications.
Accordingly, all Deliveries at East Denver Point of Delivery on
the High Plains System shall be subject to a High Plains Gas
Quality Control ("High Plains GQC") surcharge related to the
costs associated with maintaining the Section 3.5 quality
specifications. Firm service with Primary Points of Delivery
entitlements at East Denver on High Plains shall be charged the
High Plains GQC reservation and commodity surcharges. Gas
Delivered at East Denver on the High Plains System under an
interruptible rate schedule or firm service rate schedule on a
Secondary Basis shall be charged the High Plains GQC commodity
surcharge.