Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Sixth Revised Sheet No. 340 Sixth Revised Sheet No. 340
Superseding: Fifth Revised Sheet No. 340
GENERAL TERMS AND CONDITIONS
(Continued)
(c) If more than one bid is received that is equal to or exceeds
all the minimum terms and conditions specified in the Releasing
Shipper's notice, then the Replacement Shipper(s) shall be the
Bidding Shipper(s) who offer(s) the highest bid, based on the
bid evaluation methods as posted by the Releasing Shipper in
its notice of release. Transporter shall evaluate and rank all
bids submitted during the open season. If Bidding Shipper has
made a bid based on a contingency and such contingency has not
been removed by the date and time specified by Releasing
Shipper or pursuant to the timeline parameters specified in
Section 9.6 hereof, such bid shall be deemed withdrawn. If bids
from two or more Bidding Shippers results in bids of equal
value, then the capacity shall be awarded pursuant to Section
9.12(g) hereof.