Colorado Interstate Gas Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective

Fourth Revised Sheet No. 290 Fourth Revised Sheet No. 290

Superseding: Third Revised Sheet No. 290

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

6.4(c) (continued)

 

(iv) The next quantities scheduled for injection or

withdrawal shall be authorized firm storage overrun

quantities.

 

(d) Allocation of Injection and Withdrawal Capacity. If the

capacity expected to be available for either injection or

withdrawal from storage on any Day is less than the scheduled

quantities for any reason, then Transporter shall inject into

and withdraw Gas from storage consistent with the following

priorities:

 

(i) The first quantities to be injected or withdrawn shall

be those quantities required to meet Transporter's

system management.

 

(ii) The next quantities to be injected or withdrawn shall be

those firm storage service quantities. Within this

group, injection and withdrawal capacity shall be shared

pro rata on the basis of Shipper's MDIQ/YMDIQ/TMDIQ or

ADWQ/YADWQ/TADWQ, as appropriate.

 

(iii) The next quantities to be injected or withdrawn shall be

Interruptible Storage Service quantities.

 

1. Injection shall be performed as follows: Quantities

to which higher rates are applicable shall be

scheduled before quantities to which lower rates

are applicable. Nominations of quantities to which

a higher rate is applicable shall be fully

satisfied before any Nominated quantities to which

a lower rate is applicable are scheduled. Where the

rate is the same and capacity is not available,

service shall be pro rata based on quantities

Nominated.