Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Twelfth Revised Sheet No. 281C Twelfth Revised Sheet No. 281C
Superseding: Eleventh Revised Sheet No. 281C
GENERAL TERMS AND CONDITIONS
(Continued)
6.1(e) (continued)
(vi) Scheduling of Intraday Nominations shall be based on the
elapsed pro rata scheduled quantities.
Elapsed-prorated-scheduled quantity means that portion
of the scheduled quantity that would have theoretically
flowed up to the effective time of the Intraday
Nomination being confirmed, based upon a cumulative
uniform hourly quantity for each Nomination period
affected. (NAESB Definition 1.2.12)
(vii) Intraday Nominations may be submitted to increase or
decrease total Gas flow and may be used to change
Point(s) of Receipt and Delivery. (NAESB Standard
1.3.11) Intraday Nominations may be used to Nominate new
supply or market. (NAESB Standard 1.3.33)
(viii) Intraday Nominations do not rollover (i.e. Intraday
Nominations span one Day only). Intraday Nominations do
not replace the remainder of a standing Nomination.
There is no need to re-nominate if Intraday Nomination
modified existing Nomination. (NAESB Standard 1.3.13)
Intraday Nominations which are not able to be Confirmed
are considered to be void.
(ix) Intraday Nominations shall be considered complete upon
Transporter's receipt of a valid Nomination and the
corresponding up and downstream confirmations.
(x) Transporter will re-determine scheduled quantities,
pursuant to the scheduling priorities of this Section 6,
at the Evening, Intraday 1 and Intraday 2 Nomination
Cycles when such scheduled quantities are affected by a
discount requested by Shipper and granted by
Transporter. Such re-determination may cause a
discounted Firm Shipper that received a discount after
gas has been scheduled to be Bumped.