GENERAL TERMS AND CONDITIONS
(Continued)
6.1(d)(continued)
(iv) Completion of Upstream and Downstream Interconnect
Confirmations 3:30 p.m.
(v) Transporter issues/posts Report(s) of Confirmed
Quantities 4:30 p.m.
(vi) Gas Flow Period is one Gas Day which begins at 9:00
a.m. the Day following Confirmation of the Nomination.
(e) Intraday Nomination Requirements.
(i) For services that provide for Intraday Nominations and
scheduling, there is no limitation as to the number of
Intraday Nominations (line items as per NAESB Standard
1.2.1) which a Shipper may submit at any one standard
Nomination cycle or in total across all standard
Nomination cycles. (NAESB Standard 1.3.32)
(ii) Intraday Nominations are to be submitted in full-Day
quantities.
(iii) Firm Intraday Nominations shall be scheduled ahead of
previously scheduled interruptible Nominations in the
Evening and Intraday 1 Cycles. Application of this
provision will result in such interruptible Nominations
being Bumped.
(iv) When a previously confirmed and scheduled quantity is
altered, notification of such alteration should be
provided to all of the Parties below that are affected:
1) Confirmation Requester in a Confirmation Response (or
unsolicited Confirmation Response as applicable)
document by the Confirming Party; 2) Confirming Party in
a Request for Confirmation document by the Confirmation
Requester; 3) Service Requester(s) in a Scheduled
Quantity document by the applicable Confirming Party or
Confirmation Requester on whose system the Service
Requester(s) Nomination(s) were made. (NAESB Standard
1.3.44)