Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Third Revised Sheet No. 251A Third Revised Sheet No. 251A
Superseding: Second Revised Sheet No. 251A
GENERAL TERMS AND CONDITIONS
(Continued)
4.2 (continued)
(d) Prior to reserving capacity for future expansion/extension
projects, all capacity to be reserved must be posted as
unsubscribed capacity or in an open season for at least five
business days. Transporter shall post and award available
capacity in accordance with the service request procedures of
Section 4.1 of these General Terms and Conditions.
(e)When the capacity to be reserved is offered through an open
season, Transporter shall have the right to impose minimum terms
and conditions for bids that would be acceptable. In the event
that the subsequent expansion project open season imposes
minimum terms and conditions that are materially different from
the terms and conditions imposed in the previous capacity open
season, Transporter shall hold another open season for the
reserved capacity that uses the same minimum terms and
conditions as were imposed for the expansion project open
season. If the expansion project open season is held prior to
or during the open season for the reserved capacity, Transporter
shall use the same minimum terms and conditions as used for the
expansion project open season.
(f) Any capacity reserved under this Section 4.2 shall be made
available for transportation service pursuant to these General
Terms and Conditions on a limited-term basis up to the in-
service date of the expansion project(s). For such limited-term
FTSAs, Transporter reserves the right to limit any term
extension rights provided in the FTSA and pursuant to Section
4.6 (ROFR) commensurate with the proposed in-service date of the
expansion project. Transporter will indicate in any posting of
the reserved capacity any limitations on term extension rights
that will apply to such limited-term transportation service.
(g) Any capacity reserved for a project that does not go forward for
any reason shall be reposted as generally available capacity
within 30 days of the date that the project terminates, with the
exception of capacity committed to in contracts entered into on
an interim limited-term basis, which shall be posted as
available at the expiration of the interim contracts.