Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Tenth Revised Sheet No. 244 Tenth Revised Sheet No. 244
Superseding: Ninth Revised Sheet No. 244
GENERAL TERMS AND CONDITIONS
(Continued)
3.2 continued
(c) Transporter may accept Gas with a water vapor content in
excess of 7 pounds per million cubic feet; provided that the
Gas is subsequently processed within the Lakin or Mocane
plants. However, the Gas must meet the Section 3.1(a)(v)
specification after processing at these plants and before
reintroduction into CIG's mainline facilities.
(d) Transporter may accept Gas with a hydrocarbon dew point in
excess of 25 degrees Fahrenheit at any pressure between 100
p.s.i.a. and 1,480 p.s.i.a. as calculated from the Gas
composition at the East Dry Creek, Cavalry, Bent-Wagon Trail
and Fluke Meter Stations for quantities not to exceed 1,000
Dth/d at each location and at the Kiowa Meter Station for
quantities not to exceed 4,000 Dth/d.
(e) Transporter may accept Gas with a Gross Heating Value in
excess of 1,235 Btus per cubic foot at a pressure of 14.73
p.s.i.a. and a temperature of 60 degrees Fahrenheit; provided
that the Gas is subsequently processed at the BP Wattenberg,
Lakin, Mocane, Natural Buttes, Rawlins, or Roggen plants.
However, the Gas must meet the Section 3.1(c) specification
after processing at these plants and upon reintroduction into
CIG's mainline facilities.
(f) Transporter may accept Gas with a Gross Heating Value in
excess of 1,235 Btus per cubic foot at a pressure of 14.73
p.s.i.a. and a temperature of 60 degrees Fahrenheit at the
East Dry Creek, Cavalry, Bent-Wagon Trail and Fluke Meter
Stations for quantities not to exceed 1,000 Dth/d at each
location and at the Kiowa Meter Station for quantities not to
exceed 4,000 Dth/d.
(g) Transporter may accept Gas with a water vapor of no more than
7 pounds per million cubic feet into the Enterprise Lateral
(running from the Enterprise gathering facilities to the BP
Wattenberg Plant), provided the Gas is subsequently processed
at the BP Wattenberg Plant and meets the Section 3.1 (a) (v)
specification after processing and upon reintroduction into
CIG's facilities.