3.2 continued

 

(c) Transporter may accept Gas with a water vapor content in

excess of 7 pounds per million cubic feet; provided that the

Gas is subsequently processed within the Lakin or Mocane

plants. However, the Gas must meet the Section 3.1(a)(v)

specification after processing at these plants and before

reintroduction into CIG's mainline facilities.

 

(d) Transporter may accept Gas with a hydrocarbon dew point in

excess of 25 degrees Fahrenheit at any pressure between 100

p.s.i.a. and 1,480 p.s.i.a. as calculated from the Gas

composition at the East Dry Creek, Cavalry, Bent-Wagon Trail

and Fluke Meter Stations for quantities not to exceed 1,000

Dth/d at each location and at the Kiowa Meter Station for

quantities not to exceed 4,000 Dth/d.

 

(e) Transporter may accept Gas with a Gross Heating Value in

excess of 1,235 Btus per cubic foot at a pressure of 14.73

p.s.i.a. and a temperature of 60 degrees Fahrenheit; provided

that the Gas is subsequently processed at the BP Wattenberg,

Lakin, Mocane, Natural Buttes, Rawlins, or Roggen plants.

However, the Gas must meet the Section 3.1(c) specification

after processing at these plants and upon reintroduction into

CIG's mainline facilities.

 

(f) Transporter may accept Gas with a Gross Heating Value in

excess of 1,235 Btus per cubic foot at a pressure of 14.73

p.s.i.a. and a temperature of 60 degrees Fahrenheit at the

East Dry Creek, Cavalry, Bent-Wagon Trail and Fluke Meter

Stations for quantities not to exceed 1,000 Dth/d at each

location and at the Kiowa Meter Station for quantities not to

exceed 4,000 Dth/d.

 

(g) Transporter may accept Gas with a water vapor of no more than

7 pounds per million cubic feet into the Enterprise Lateral

(running from the Enterprise gathering facilities to the BP

Wattenberg Plant), provided the Gas is subsequently processed

at the BP Wattenberg Plant and meets the Section 3.1 (a) (v)

specification after processing and upon reintroduction into

CIG's facilities.