Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Fourteenth Revised Sheet No. 243 Fourteenth Revised Sheet No. 243
Superseding: Thirteenth Revised Sheet No. 243
GENERAL TERMS AND CONDITIONS
(Continued)
3.1(d) continued
Receipt, then the temperature of such Gas shall not exceed 90
degrees Fahrenheit.
(e) Shipper warrants that the hydrocarbon dew point of all Gas
Tendered will not exceed a temperature of 25 degrees Fahrenheit
at any pressure between 100 p.s.i.a. and 1,480 p.s.i.a. as
calculated from the Gas composition.
Notwithstanding Sections 3.1 through 3.3, Transporter shall not be
required to receive Gas at any Point of Receipt which is of a
quality inferior to that required by Shipper or a third Party at any
Point of Delivery under the Agreement. Transporter shall not be
liable to Shipper or any third Party for any damages incurred as a
result of Transporter's refusal to receive Gas as a result of this
provision.
3.2 Specification Exemptions. Transporter, in its reasonable discretion
and judgment, may accept Gas that does not conform to the quality
specifications in Section 3.1 but meets the conditions set forth
below, provided Transporter determines that such acceptance will not
interfere with Transporter's ability to: (1) maintain prudent and
safe operation of Transporter's pipeline system and storage
facilities, (2) ensure that such Gas does not adversely affect
Transporter's ability to provide service to others, and (3) ensure
that such Gas does not adversely affect Transporter's ability to
Tender Gas for Delivery to a downstream pipeline or end-user.
(a) Transporter may accept Gas with no more than 2000 parts per
million (.200 percent) by volume of oxygen at a pressure of
14.73 p.s.i.a. and a temperature of 60 degrees Fahrenheit at
any Point(s) of Receipt.
(b) Transporter may accept Gas with a hydrocarbon dew point in
excess of 25 degrees Fahrenheit at any pressure between 100
p.s.i.a. and 1,480 p.s.i.a. as calculated from the Gas
composition; provided that the Gas is subsequently processed
at the BP Wattenberg, Lakin, Mocane, Natural Buttes, Rawlins,
or Roggen plants. However, the Gas must meet the Section
9.1(e) specification after processing at these plants and upon
reintroduction into CIG's mainline facilities.