Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/11/2001, Docket: RP02- 42-000, Status: Effective
Twelfth Revised Sheet No. 232 Twelfth Revised Sheet No. 232 : Superseded
Superseding: Eleventh Revised Sheet No. 232
GENERAL TERMS AND CONDITIONS
(Continued)
1.40 (Continued)
(a) Evening Cycle - the day prior to the Gas Day
(b) Intraday 1 Cycle - during the Gas Day
(c) Intraday 2 Cycle - during the Gas Day
1.41 "Loan", "Loaned" or "Lending" shall mean Transporter's advancement
of quantities of Gas to Shipper at a Park and Loan Point pursuant to
Rate Schedules PAL-1 and APAL-1 Agreements.
1.42 "Maximum Available Capacity" or "MAC" shall mean the maximum
quantity of Gas (expressed in Dth) that Transporter is required to
accept under Rate Schedules FS-1, NNT-1, and NNT-2 for injection
into storage during the Injection Period on Shipper's behalf.