Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Second Revised Sheet No. 229.01 Second Revised Sheet No. 229.01
Superseding: First Revised Sheet No. 229.01
GENERAL TERMS AND CONDITIONS
(Continued)
1.5 Average Thermal Content of Gas in Storage ("ATC") continued
(c) Average Thermal Content of Gas in Totem Storage ("Totem
Storage ATC") shall be calculated by dividing the Dekatherms
by the Volume, in Mcf, in Transporter's Totem Storage Fields,
excluding base Gas, at the point in time. The Totem Storage
ATC shall be assumed to be 1,000 Btu per cubic foot for
purposes of contract entitlement and rate design. Transporter
shall monitor storage injections and withdrawals and calculate
the actual Totem Storage ATC of Gas in storage on October 31
of each year. If the actual Totem Storage ATC deviates from
the currently effective Totem Storage ATC by more than plus or
minus 20 Btu per cubic foot, the actual Totem Storage ATC
shall become the new effective Totem Storage ATC and shall be
posted on Transporter's electronic bulletin board and on
Transporter's Web Site under Informational Postings, by
November 15 of each year, and a corresponding adjustment will
be made to Shipper's TMDIQ, TMDWQ and TMAC entitlements.
Transporter may make these annual adjustments for smaller
changes in Btu per cubic foot values if in Transporter's
judgment such change is required to avoid system disruption.
(d) Any adjustment to ATC will be posted on Transporter's
electronic bulletin board as a percentage increase or decrease
in entitlements and each firm storage customer's adjusted
entitlements will also be posted. The adjusted entitlements
will take effect upon posting. If an adjustment pursuant to
this Section 1.5 causes Shipper to be in an overrun situation,
Shipper will have 30 Days before being subject to overrun
charges. When an adjustment to storage contract entitlement is
made pursuant to this Section 1.5, a corresponding adjustment
to storage rates will also be made effective the first of the
Month, the Month following the date such adjustment is posted
on Transporter's electronic bulletin board.
1.6 "Begin Date" shall mean the Day specified by a Shipper on which a
Gas transaction is to begin. Most Gas transactions are to be
effective for a full Gas Day. However, Shippers may indicate a
requested beginning time when submitting Intraday Nominations.
1.7 "Bidding Shipper(s)" is any Shipper who is prequalified pursuant to
Section 9 of the General Terms and Conditions to bid for capacity or
who is a Party to a prearranged release.