Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/08/2010, Docket: RP10-367-000, Status: Effective
Eleventh Revised Sheet No. 229A Eleventh Revised Sheet No. 229A
Superseding: Tenth Revised Sheet No. 229A
GENERAL TERMS AND CONDITIONS
(Continued)
1.8 The term "British thermal unit" or Btu shall mean the amount of heat
required to raise the temperature of one pound of water one degree
Fahrenheit at standard conditions.
1.9 "Bumping" or "Bump" shall mean:
(a) The reduction of a previously Scheduled and Confirmed
Interruptible Transportation Quantity to permit Transporter
to schedule and confirm a firm Transportation Nomination
which has a higher priority and which was submitted as an
Intraday Nomination.
(b) In the event that a discount is granted that affects
previously scheduled quantities, "Bumping" or "Bump" shall
also mean the reduction of a Firm Transportation Quantity
previously Scheduled and Confirmed to permit Transporter to
schedule and confirm a firm Transportation Intraday
Nomination which has a higher priority.
(c) In the event of an intraday recall of released capacity,
"Bumping" or "Bump" shall also mean the reduction of the
Replacement Shipper's previously Scheduled and Confirmed
Firm Transportation Quantity.
Bumping that affects transactions on multiple Transportation
Service Providers' systems should occur at grid-wide synchronization
times (NAESB Standard 1.3.39). Pursuant to NAESB Standard 1.2.12,
absent an agreement to the contrary between Transporter, Shipper and
any affected interconnected party, a Bump shall not result in a
Scheduled Quantity that is less than the applicable elapsed pro
rated flow quantity.
1.10 "Business Day" shall mean Monday, Tuesday, Wednesday, Thursday, and
Friday, excluding Federal Bank Holidays.