Colorado Interstate Gas Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/08/2010, Docket: RP10-367-000, Status: Effective

Eleventh Revised Sheet No. 229A Eleventh Revised Sheet No. 229A

Superseding: Tenth Revised Sheet No. 229A

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

1.8 The term "British thermal unit" or Btu shall mean the amount of heat

required to raise the temperature of one pound of water one degree

Fahrenheit at standard conditions.

 

1.9 "Bumping" or "Bump" shall mean:

 

(a) The reduction of a previously Scheduled and Confirmed

Interruptible Transportation Quantity to permit Transporter

to schedule and confirm a firm Transportation Nomination

which has a higher priority and which was submitted as an

Intraday Nomination.

 

(b) In the event that a discount is granted that affects

previously scheduled quantities, "Bumping" or "Bump" shall

also mean the reduction of a Firm Transportation Quantity

previously Scheduled and Confirmed to permit Transporter to

schedule and confirm a firm Transportation Intraday

Nomination which has a higher priority.

 

(c) In the event of an intraday recall of released capacity,

"Bumping" or "Bump" shall also mean the reduction of the

Replacement Shipper's previously Scheduled and Confirmed

Firm Transportation Quantity.

 

Bumping that affects transactions on multiple Transportation

Service Providers' systems should occur at grid-wide synchronization

times (NAESB Standard 1.3.39). Pursuant to NAESB Standard 1.2.12,

absent an agreement to the contrary between Transporter, Shipper and

any affected interconnected party, a Bump shall not result in a

Scheduled Quantity that is less than the applicable elapsed pro

rated flow quantity.

 

1.10 "Business Day" shall mean Monday, Tuesday, Wednesday, Thursday, and

Friday, excluding Federal Bank Holidays.