Colorado Interstate Gas Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective

Third Revised Sheet No. 132A.08a Third Revised Sheet No. 132A.08a

Superseding: Second Revised Sheet No. 132A.08a

 

RATE SCHEDULE FS-Y

YOUNG STORAGE SERVICE - FIRM

(Continued)

 

2. APPLICABILITY AND CHARACTER OF SERVICE (continued)

 

2.2 Compliance with Young Reservoir Integrity Inventory Limit.

 

(a) Shipper shall not exceed the Young Reservoir Integrity

Inventory Limit as provided in Section 8.3 of the General Terms

and Conditions. If Shipper exceeds the Young Reservoir

Integrity Inventory Limit, Transporter will seek Shipper's

immediate cooperation to bring Shipper's Gas in Place into

compliance with the Young Reservoir Integrity Inventory Limit.

If necessary, Transporter will issue Operational Flow Orders to

bring Shipper's Gas in Place into compliance with the Young

Reservoir Integrity Inventory Limit. Shipper's YMDWQ shall be

reduced pursuant to the YADWQ chart provided in Section 8.3 of

the General Terms and Conditions. Shipper shall hold

Transporter harmless and shall indemnify Transporter for any

damages which may directly or indirectly arise out of or which

relate to Shipper's failure to maintain a sufficient quantity

of Gas as in storage to satisfy its needs.

 

(b) Shipper shall have no more than 26 percent of YMAC in storage

between and including June 1 and June 22 of each year, unless

Transporter determines, on a non-discriminatory basis, that

retention of a higher quantity of Gas will not adversely affect

Transporter's Young Storage reservoirs. In such instance,

Transporter shall specify the higher level Shipper may

maintain.

 

(c) The above requirements notwithstanding, 100 percent of all

quantities stored hereunder shall be withdrawn upon expiration

of the term of the Agreement.