Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Third Revised Sheet No. 132A.02 Third Revised Sheet No. 132A.02
Superseding: Second Revised Sheet No. 132A.02
RATE SCHEDULE FS-1
STORAGE SERVICE - FIRM
(Continued)
2.5 If, on any day during the Withdrawal Period, Shipper requests
Transporter to withdraw and Deliver to Shipper a quantity of Gas
within Shipper's Available Daily Withdrawal Quantity ("ADWQ"), and
Transporters fails to do so, then Shipper's obligation to withdraw
its Gas shall be extended by the number of days that Transporter
failed to withdraw and Deliver the quantity requested by Shipper.
Any quantities required to be withdrawn which have not been
withdrawn as provided hereunder shall become the property of
Transporter without charge and shall be free and clear of any
adverse claims.
2.6 This service shall be subject to Section 9 of the General Terms and
Conditions pertaining to capacity release.
2.7 Shipper shall be entitled to inject Gas during the Withdrawal
Period at the injection rate and withdraw Gas during the Injection
Period at the withdrawal rate subject to agreement by Transporter.
2.8 Request for Authorized Overrun Service. On any Day, Shipper may
request Transporter to accept injections into storage resulting in
Shipper's Gas in Place to exceed Shipper's MAC.
(i) Shipper must obtain Transporter's prior consent for such
overrun service for quantities in excess of Shipper's
MAC to be considered Authorized Overrun Quantities. If
Transporter's prior consent is not obtained, the
requested quantities shall not be scheduled.
(ii) When approved by Transporter, authorized overrun
injection or withdrawal requests are for full Day
quantities.