Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
First Revised Sheet No. 75O First Revised Sheet No. 75O
Superseding: Original Sheet No. 75O
RATE SCHEDULE NNT-1
NO-NOTICE STORAGE AND TRANSPORTATION SERVICE - FIRM
(Continued)
(c) Daily Authorized Storage Capacity Overrun. An amount obtained
by multiplying the quantity of Gas in Place on any Day which is
in excess of Shipper's MAC by the Daily Authorized Capacity
Overrun Rate. The Daily Authorized Capacity Overrun Rate shall
be the applicable maximum rate unless otherwise agreed to by
Transporter and Shipper and shall not be less than the
applicable minimum rate or more than the applicable maximum
rate as set forth on the Statement of Rates.
(d) Hourly Authorized Overrun. On any Day, upon request of Shipper
and with Transporter's consent, Shipper may take Hourly
Deliveries of Gas in excess of 1/24th of Shipper's MDQ under
this rate schedule. Such quantities shall be Tendered at an
agreed upon level at Primary Point(s) of Delivery Rates of Flow
as stated in Section 2.2 of this rate schedule. All such
quantities shall be Transported as Hourly Authorized Overrun
Gas on an interruptible basis. Shipper shall pay an amount
obtained by multiplying the largest quantity of such Hourly
Authorized Overrun Gas during any one Hour of a Day times 24,
times the Hourly Authorized Overrun Rate. The Hourly Authorized
Overrun Rate shall be the applicable maximum rate unless
otherwise agreed to by Transporter and Shipper. Such agreed
upon rate shall not be less than the applicable minimum rate or
more than the applicable maximum rate set forth on the
Statement of Rates.
4.3 Daily Unauthorized Overrun. On any Day, Deliveries to Shipper or for
Shipper's account which exceed Shipper's MDQ, ADIQ, ADWQ and MAC at
any Point(s) and which have not been authorized by Transporter, are
unauthorized and shall be subject to the Daily Unauthorized Overrun
Rate (non-Critical or Critical Condition as applicable). Shipper
shall pay the total of the amounts obtained by multiplying the
quantity of such daily unauthorized overrun Gas for each day during
the Month by the Daily Unauthorized Overrun Rate, as adjusted by the
provisions of Section 4.4, below.
4.4 Hourly Unauthorized Overrun. Hourly Unauthorized Overrun charges
will be assessed if the total hourly deliveries for an hour exceed
the total delivery rights for that hour. Hourly delivery quantities
in excess of authorized hourly deliveries shall be subject to the
Hourly Unauthorized Overrun Rate on the Statement of Rates. Hourly
overrun delivery quantities will be determined using a two step
process.