Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Fourth Revised Sheet No. 63 Fourth Revised Sheet No. 63
Superseding: Third Revised Sheet No. 63
RATE SCHEDULE TF-HP
HIGH PLAINS TRANSPORTATION SERVICE - FIRM
1. AVAILABILITY
1.1 This Rate Schedule is available to any Party (hereinafter referred
to as "Shipper") for the Transportation of natural Gas on a firm
basis by Transporter from a Point of Receipt on the High Plains
System to a Point of Delivery on the High Plains System when:
(a) Shipper makes a complete request for Transportation Service in
accordance with Section 4 of the General Terms and Conditions;
(b) Transporter has determined that, other than necessary tap(s),
valves, measurement equipment and other minor facilities
necessary to effectuate service at any new or existing Point of
Receipt or Delivery on the High Plains System (which
Transporter shall provide upon written request and on a not
unduly discriminatory basis at reasonable, mutually agreeable
locations which will not adversely affect the existing
operation of Transporter's system or significantly alter the
operation of the pipeline system), Transporter has available or
will secure sufficient uncommitted capacity to provide the
service requested by Shipper as well as Transporter's other
High Plains firm service commitments;
(c) Shipper has met the service requirements specified in Section 4
of the General Terms and Conditions, including the
creditworthiness conditions specified in Section 4.14 of the
General Terms and Conditions; and
(d) Shipper and Transporter have executed a Firm Transportation
Service Agreement (Agreement) pursuant to the terms of this
Rate Schedule.