Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Second Revised Sheet No. 13E.01 Second Revised Sheet No. 13E.01
Superseding: First Revised Sheet No. 13E.01
STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS
FOOTNOTES
(Continued)
(Note 12 continued)
Base Rates per Dth
at 1000 Btu
------------------
Rate Schedule Minimum Maximum
------------- ------- -------
TSB-T:
Phase 2 Reservation Rates -
R1 Rate(Monthly Rate).............................. $0.0000 $16.0953
High Plains...................................... $0.0000 $4.1979
Storage Deliverability........................... $0.0000 $5.9487
Storage Capacity................................. $0.0000 $5.9487
Commodity Injection Rate............................. $0.0937 $0.0937
Commodity Delivery Rate.............................. $0.0949 $0.0949
Daily Authorized Delivery Overrun Rate .............. $0.0012 $0.1392
Daily Authorized Injection/Withdrawal Overrun Rate... $0.0937 $0.1956
Daily Authorized Storage Capacity Overrun Rate....... $0.0937 $0.1983
Daily Unauthorized Overrun Rate (Note 7) -
Greater of 100 Dth or 3% of MDQ, TMDIQ, TMDWQ or TMAC $1.0584
Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC
(Non-Critical Condition)..................... $2.6460
Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC
(Critical Condition)......................... $5.2920