Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Second Revised Sheet No. 13G Second Revised Sheet No. 13G
Superseding: First Revised Sheet No. 13G
STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS
FOOTNOTES
(Continued)
(Note 12 continued)
Base Rates per Dth
at 1000 Btu
-------------------
Rate Schedule Minimum Maximum
------------- ------- -------
FS-1:
Reservation Rates -
Storage Capacity Rate(Monthly Rate)(Note 6). . $0.0000 $0.2072
Reservation Rate (Monthly Rate)(Note 6). . . . $0.0000 $1.2217
Hourly Rates of Flow Option(Monthly Rate)(Note 6) $0.0000 $0.3088
Quantity Injection Rate. . . . . . . . . . . . . $0.0117 $0.0117
Quantity Withdrawal Rate . . . . . . . . . . . . $0.0117 $0.0117
Daily Authorized Injection/Withdrawal
Overrun Rate . . . . . . . . . . . . . . . . . . $0.0117 $0.6405
Daily Authorized Storage Capacity Overrun Rate. . $0.0117 $0.6405
FS-Y:
Reservation Rates -
Storage Capacity Rate(Monthly Rate). . . . . . $0.0000 $0.0615
Reservation Rate (Monthly Rate). . . . . . . . $0.0000 $1.6292
Quantity Injection Rate. . . . . . . . . . . . . $0.0209 $0.0209
Quantity Withdrawal Rate . . . . . . . . . . . . $0.0209 $0.0209
Daily Authorized Injection/Withdrawal
Overrun Rate . . . . . . . . . . . . . . . . . . $0.0418 $0.1439
Daily Authorized Storage Capacity Overrun Rate. . $0.0418 $0.1439