Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
First Revised Sheet No. 13F First Revised Sheet No. 13F
Superseding: Original Sheet No. 13F
STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS
FOOTNOTES
(Continued)
(Note 12 continued)
Base Rates per Dth
at 1000 Btu
-------------------
Rate Schedule Minimum Maximum
------------- ------- -------
TSB-T:
Phase 3 Reservation Rates -
R1 Rate(Monthly Rate).............................. $0.0000 $15.7775
High Plains...................................... $0.0000 $4.1979
Storage Deliverability........................... $0.0000 $5.7898
Storage Capacity................................. $0.0000 $5.7898
Commodity Injection Rate............................. $0.0782 $0.0782
Commodity Delivery Rate.............................. $0.0794 $0.0794
Daily Authorized Delivery Overrun Rate .............. $0.0012 $0.1392
Daily Authorized Injection/Withdrawal Overrun Rate... $0.0782 $0.1903
Daily Authorized Storage Capacity Overrun Rate....... $0.0782 $0.1654
Daily Unauthorized Overrun Rate (Note 7) -
Greater of 100 Dth or 3% of MDQ, TMDIQ, TMDWQ or TMAC $1.0374
Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC
(Non-Critical Condition)..................... $2.5935
Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC
(Critical Condition)......................... $5.1870