Colorado Interstate Gas Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective

Seventh Revised Sheet No. 13E Seventh Revised Sheet No. 13E

Superseding: Sixth Revised Sheet No. 13E

 

STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS

 

FOOTNOTES

(Continued)

 

(Note 12 continued)

Base Rates per Dth

at 1000 Btu

------------------

Rate Schedule Minimum Maximum

------------- ------- -------

TSB-T:

Phase 1 Reservation Rates -

R1 Rate(Monthly Rate).............................. $0.0000 $18.5911

High Plains...................................... $0.0000 $4.1979

Storage Deliverability........................... $0.0000 $7.1966

Storage Capacity................................. $0.0000 $7.1966

 

Commodity Injection Rate............................. $0.0850 $0.0850

Commodity Delivery Rate.............................. $0.0862 $0.0862

 

Daily Authorized Delivery Overrun Rate .............. $0.0012 $0.1392

 

Daily Authorized Injection/Withdrawal Overrun Rate... $0.0850 $0.2366

 

Daily Authorized Storage Capacity Overrun Rate....... $0.0850 $0.1799

 

Daily Unauthorized Overrun Rate (Note 7) -

Greater of 100 Dth or 3% of MDQ, TMDIQ, TMDWQ or TMAC $1.2224

 

Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC

(Non-Critical Condition)..................... $3.0560

 

Greater of 2,500 Dth or 5% of MDQ, TMDIQ, TMDWQ or TMAC

(Critical Condition)......................... $6.1120