Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Ninth Revised Sheet No. 13A Ninth Revised Sheet No. 13A
Superseding: Eighth Revised Sheet No. 13A
STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS
FOOTNOTES
(Continued)
(10) The use of the name "CIG" here represents all Hub locations not otherwise
identified below. Ponderosa is an interconnect with Public Service
Company of Colorado's (PSCo's) high pressure system. Arrowhead is an
interconnect with KN Interstate Gas Transmission Co. (Pony Express).
Lodgepole is an interconnect with PSCo (Front Range). Trailblazer is an
interconnect with Trailblazer Pipeline Company. WIC is an interconnect
with Wyoming Interstate Company, Ltd.
(11) Hourly Entitlement Amount ("HEA") shall mean the quantity a Shipper can
not exceed before being subject to the Hourly Unauthorized Rate. Such
quantity is described in the Unauthorized Overrun section of Rate
Schedules TF-1, TI-1, NNT-1, NNT-2, SS-1 and TF-4.