Colorado Interstate Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-689-000, Status: Effective
Fifth Revised Sheet No. 9A Fifth Revised Sheet No. 9A
Superseding: Fourth Revised Sheet No. 9A
STATEMENT OF RATES FOR TRANSPORTATION/STORAGE OF NATURAL GAS
(Continued)
Rates per Dth
(Note 1)
-------------------
Rate Schedule Minimum Maximum
------------- -------- -------
HUB-1
No Compression Required *
Commodity Rate: ................................. $0.0000 $0.0100
Compression Required
Commodity Rate (including fuel)(Note 10):
Arrowhead to Lodgepole:
(Design pressure difference 53 psig) ........ $0.0051 $0.0187
CIG to Trailblazer/WIC/Ponderosa:
(Design pressure difference 70 psig) ........ $0.0052 $0.0198
Lodgepole to CIG:
(Design pressure difference 97 psig) ........ $0.0072 $0.0218
Arrowhead to CIG:
(Design pressure difference 150 psig)........ $0.0107 $0.0254
Lodgepole to Trailblazer/WIC:
(Design pressure difference 167 psig)........ $0.0109 $0.0255
Arrowhead to Trailblazer/WIC:
(Design pressure difference 220 psig)........ $0.0145 $0.0291
Commodity Rate
(No fuel included) ............................ $0.0010 $0.0146
Cheyenne Hub Fuel Reimbursement
Arrowhead to Lodgepole:
(Design pressure difference 53 psig) ........ .079%
CIG to Trailblazer/WIC/Ponderosa:
(Design pressure difference 70 psig) ........ .081%
Lodgepole to CIG:
(Design pressure difference 97 psig) ........ .121%
Arrowhead to CIG:
(Design pressure difference 150 psig)........ .190%
Lodgepole to Trailblazer/WIC:
(Design pressure difference 167 psig)........ .193%
Arrowhead to Trailblazer/WIC:
(Design pressure difference 220 psig)........ .264%
Cheyenne Station Hub Park and Loan Rate ........ $0.0170 $0.3342
* No compression is required for all Hub receipt-delivery combinations not
identified as Compression Required.