Eastern Shore Natural Gas Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2002, Docket: RP00-393-002, Status: Effective
First Revised Sheet No. 172 First Revised Sheet No. 172 : Effective
Superseding: Original Sheet No. 172
EASTERN SHORE NATURAL GAS COMPANY
GENERAL TERMS AND CONDITIONS
(Continued)
24. Operational Flow Orders (Continued)
(c) OFO Notice, Contents and Procedures
Except for Force Majeure events, or events or conditions
which threaten the integrity of Seller's pipeline system,
Seller may issue an OFO upon notice to Buyer, which
notice shall be given at least twenty-four (24) hours in
advance of implementation. Seller shall issue OFOs by
posting on its EBB and by telephone or facsimile to
Buyer's representative. Buyer, upon notification by
Seller, shall monitor Seller's EBB for any OFO
applicable to Buyer's service and shall be solely
responsible for compliance with each OFO. Each OFO will
contain the following provisions:
(1) Time and date of issuance;
(2) Time that the OFO is considered to be effective;
(3) Duration of the OFO (if no duration is specified,
the OFO will be effective until further notice);
(4) The OFO Level declared and reason for the issuance
of the OFO;
(5) A description of the area of Seller's pipeline
system in which the OFO is in effect and the
Buyer(s) or class of Buyers affected;
(6) The specific actions required to comply with the
OFO, including the time frame within which
compliance is required to avoid penalties. These
actions include, but are not limited to, (i) a
measureable change in gas flow rate to the level
specified in the OFO, and/or (ii) written
confirmation of a flow rate change on an
interconnecting upstream pipeline, and/or (iii)
a written confirmation of a scheduling change with
Seller; and
(7) Any other terms Seller may reasonably require to
ensure the effectiveness of the OFO.